METHODOLOGY

From CAD engineering to final lockup under factory tolerances

Controlled manufacturing prevents timber swelling and moisture entrapment in structural cavities. Site footings and module framing advance simultaneously.

14 weeks

Factory Assembly

1 day

Crane Installation

Class 1a

Fully Certified

STAGED EXECUTION

The four-stage off-site pipeline

01

02

03

04

Council lodgement

Factory assembly

Enabling Works site readiness

Craneage & installation

Fast-tracked Class 1a certification and secondary dwelling approvals managed through direct council pathways.

Precision steel frames, high- performance thermal envelope, and architectural joinery - all built under controlled conditions.

Groundworks, foundation design,and site preparation completed while your modules are in production. Weather-sealed units arrive ready for constrained suburban and regional blocks.

Detailed lift planning with certified lifting equipment and experienced riggers.We partner with you to land every building safely, accurately, and on schedule.